The City of Greenwood, IN

Welcome to the website for the City of Greenwood!

FOR IMMEDIATE RELEASE
July 7, 2017

City of Greenwood announces $4 million in road construction projects
Projects include bituminous overlay mill work, alley reconstruction, a passing blister and fog sealing

GREENWOOD, Ind. – Greenwood Mayor Mark W. Myers today released a list of $4 million in planned road construction projects for summer 2017 to upgrade and enhance road quality in Greenwood.   The amount of road work is increased from previous years due to a local income tax bond issued by the City earlier in the year for road improvements. In total, five miles of roads will either be resurfaced or reconstructed.

The increased road improvements are aimed at addressing road maintenance issues and funding has been directed to those streets where needs are highest.

“We are committed to maintaining and improving road quality in Greenwood,” said Myers. “We must manage our transportation resources wisely and invest in those areas most in need of improvement in order to support existing traffic and continued growth.”

Highlights of the projects, many of which will commence this month, include:

$1,438,502.20 in pavement mill and overlay work on the following streets:

Street:

From:

To:

Polk Manor Drive

Polk Street

Dead End

Stokley Boulevard

Polk Manor Drive

Concrete Break

Commerce Parkway, South Drive

Commerce Pkwy E. Drive

Allen Road

Gerdt Court

Commerce Pkwy S. Drive

Dead End

Foxmere Boulevard

Fry Road

Foxmere Terrace

Foxmere Way

Foxmere Terrace

VanDyke Way

Foxmere Terrace

Foxmere Boulevard

Oakmere Way

Foxmere Drive

Oakmere Way

S.R. 135

Oakmere Way

Foxmere Terrace

VanDyke Way

Van Dyke Way

Foxmere Drive

Foxmere Boulevard

Camby Court

Madison Avenue

Dead End

Crescent Drive

Apryl Drive

Kimbrough Drive

Kenwood Drive

Apryl Drive

Kimbrough Drive

Kimbrough Drive

Crescent Drive

Kenwood Drive

Stop 18 - West

York Street

Averitt Road

Brook Drive

Stonemill Drive

Cottage Lane

Brook Village Drive

Apryl Drive

Cottage Lane

Cottage Lane

Stonemill Drive

Brook Drive

Stonemill Drive

Cottage Lane

Cottage Lane

Woodland Place

Woodland Drive

Dead End

Woodland Drive

Euclid Avenue

Valley Lane

Alleys - Madison/Wiley/Meridian/Broadway

Various East/ West

Various East/ West

Alleys - Madison/Wiley/Meridian/Broadway

Various North/ South

Various North/ South

$1,419,504.15 in pavement reconstruction work on the following streets: 

Reconstructed Streets:

From:

To:

AppleValley/Orchard Hill/Stonegate Road

Stonegate Drive

Stonegate Drive

Winding Brook Lane

Howard Road

Dead End

Nancy Lane

Meridian Street

Dead End

Horton Street

Fairview Drive

Fairview Drive

 

Up to $296,000 in fog sealing on the following streets:

Streets:

From:

To:

MAIN ST

MELODY AVE

S MADISON AVE

MARKET PLZ

W MAIN ST

S MADISON AVE

MERIDIAN ST

W MAIN ST

CARNEY ST

PEARL ST

DEAD END

S WASHINGTON ST

FRY RD

FOXMERE BLVD

EAST of US 31

LOVERS LN

ROLLING HILL RD

CUL-DE-SAC

MOUNT VERNON DR

NEW AMSTERDAM DR

MONTICELLO DR

MOUNT VERNON CT

MONTICELLO DR

CUL-DE-SAC

ROLLING HILL RD

CHERRYFIELD LN

CUL-DE-SAC

DUSTY TRL

ROLLING HILL RD

CUL-DE-SAC

BRAY CT

NORTHGATE DR

CUL-DE-SAC

WOODLAWN DR

N US 31

CUL-DE-SAC

COMBS RD

CITY BOUNDARY

E MAIN ST

MAIN ST

CITY BOUNDARY

FIVE POINTS RD

STONES CROSSING RD

HONEY CREEK RD

DONICA RD

HONEY CREEK RD

CURRY RD

DEMAREE RD

DONICA RD

PINE LAKE DR

W STONES CROSSING RD

CROSSROADS DR

N US 31

CUL-DE-SAC

BLACKBERRY DR

ASHTON LN

DONICA RD

GRANDIFLORA DR

ASHTON LN

WILDFLOWER LN

DEMAREE RD

S SR 135

S HONEY CREEK RD

WILDFLOWER LN

ASHTON LN

BLACKBERRY DR

ASHTON LN

BLACKBERRY DR

STONES CROSSING RD

STONES CROSSING RD

CITY BOUNDARY

S HONEY CREEK RD

STOP 18 RD

PROFIT ST

N 75 E

CYPRESS

ELLINGTON CIR

ST CHARLES PL

ASHTON PARKE DR

JENNIFER DR

AVERITT RD

VILLAGE CIRCLE DR

ASHTON PARKE DR

CUL-DE-SAC

ST CHARLES PL

JENNIFER DR

CYPRESS S

ELLINGTON CIR

CUL-DE-SAC

CYPRESS S

JENNIFER DR

ELLINGTON CIR

ASHTON PARKE DR

ALVEY CT

BLUE GRASS PKWY

CUL-DE-SAC

OLIVE BRANCH RD

CITY BOUNDARY

S SR 135

Fog Sealing is a spray-on treatment that delays the aging process by replenishing the molecular components and re-constituting the asphalt.  Residents that live on these streets will receive door-flyers and notifications.

Greenwood also recently awarded an $800,000 road project that will make significant improvements to the intersection of Stop 18 Road and U.S. 31.  A new turn lane will be added on Stop 18 and a large roadside swale will be improved.  The improvements will produce a safer intersection with better traffic flow while increasing sidewalk connectivity for pedestrians.

Two other improvements included the City’s summer road work will include a new passing blister on Smith Valley Road at the entry to Brandywine subdivision and the resurfacing and striping of the public parking lot located on Pearl Street in Old Town.

No road closures are planned for these projects, but there may be occasional lane restrictions. The City indicated its commitment to providing clear and frequent updates so commuters can adjust travel plans.

Construction activities are also progressing for the new roundabout at Smith Valley and Yorktown Roads.  In recent weeks construction crews have installed concrete curbs, sidewalk, and portions of the asphalt pavement.  “The project has benefited from favorable weather conditions over the past five weeks.  The Contractor is currently on-track to complete construction by July 28 as scheduled” said Daniel Johnston, City Engineer.

The road construction projects are expected to begin in the next week or two.  Most of the projects will be completed by the fall. 

###

2017 road construction