The Sewer Availability Fee (SAF) is a one-time fee to connect to Greenwood’s sanitary sewer system. The fee is based upon the size of the water meter installed in the building.
Sewer Availability Fee Application
Fees:
| 5/8 to 3/4 inch: | $2,073 |
| 1 inch: | $5,389.80 |
| 1.5 inch: | $12,023.40 |
| 2 inch: | $20,730 |
| 3 inch: | $47,679 |
| 4 inch: | $84,993 |
| 6 inch: | $190,716 |
| 8 inch: | $339,972 |